Moji Majstori Moji Majstori
Records from the field

Portfolio

Jobs recorded on site: what we found, how the work went and how the finished job looks. The photos are ours, from jobs that were really done.

40  jobs300  photos selected8  municipalities
15 jobs · 150 photos

Rough work and renovations

Water and waste runs, chasing, waterproofing and preparation for tiling, complete bathroom and kitchen renovations.

A second bathroom from the same run, a vanity unit with basin and a mirrorBefore and after

Before and after

The same space before the intervention and after it.

15 photos
The same wall from another point, the pattern framing the niche in the middleFinished job

A bathroom in Spanish tiles

From preparation and waterproofing to a finished bathroom with concealed mixers.

15 photos
The shower cabin from another angle, the rain head and sliding doorsFinished job

Renovation, rough works and installation

From demolition and rough-in to installing the sanitary ware.

10 photos
The bathroom as a whole, the enclosure and basin on the finished tilingFinished job

Sanitary ware and shower enclosure fitted

A finished bathroom: wall-hung WC, bidet, vanity unit and shower enclosure.

4 photos
The whole tub in the room, the drain in the middle and a grab rail on the wallBefore and after

Converting a standard bath to a French one

Changing the drain and bricking in; the bathroom stays usable.

8 photos
The concealed cistern and waste connected, the layout ready for testingBefore and after

Rough works and waterproofing

Installation and waterproofing before the covering goes on.

11 photos
The final stage, the flush plate and the niche above the panBefore and after

WC modernisation

Replacing old equipment and tidying the installation behind it.

17 photos
The finished bathroom in dark tiles with a toilet and a glass enclosure

Rough plumbing works

Various positions: rough-in, pipe runs, chases and preparation for the covering.

13 photos
The cistern frame beside the stack, the waste joined onto the branch

Bathroom, WC and kitchen

A complete rough-in for three wet rooms in one flat.

11 photos
The concealed cistern frame below the window and the waste to the pan

Rough works, bathroom

Water and waste rough-in in a bathroom.

10 photos
The cistern frame close up, the water connection and the outlet for the pan

Rough works, bathroom and kitchen

A rough-in for a bathroom and kitchen in the same flat.

9 photos
The new gully lowered into the floor opening and joined to the waste

Bathroom and kitchen, second position

One more rough-in for a bathroom and kitchen.

6 photos

The galleries grow as new photos arrive from the field. Each gallery carries the colour of its trade.

Emergency interventions

A fault that cannot wait for morning

A burst pipe, sewage backing up, water that cannot be shut off, a dangerous electrical fault, water reaching the electrical installation, a faulty lock or door. Everything carrying a risk of flood, fire or major damage. We come out at night, on Sundays and on holidays too.

Call 063 33 66 99 More about emergency interventions

The emergency call-out price is in the price list; labour is billed separately, according to the job established on site.

Message usWhatsAppWhatsApp Emergency 24/7063 33 66 99Call