BeforeThe bathroom stripped back to the wall.
Before
In progress
In progressA pipe in its chase.
In progress
In progressThe complete pipework before waterproofing.
In progress
In progress
FinishedWaterproofing applied.
Finished
Finished
There are more photos from this job; 11 of 15 are shown here.
Other galleries
Before and afterBefore and after
The same space before the intervention and after it.
15 photos
Rough plumbing works
Various positions: rough-in, pipe runs, chases and preparation for the covering.
13 photos
Finished jobRenovation, rough works and installation
From demolition and rough-in to installing the sanitary ware.
10 photosA fault that cannot wait for morning
A burst pipe, sewage backing up, water that cannot be shut off, a dangerous electrical fault, water reaching the electrical installation, a faulty lock or door. Everything carrying a risk of flood, fire or major damage. We come out at night, on Sundays and on holidays too.
The emergency call-out price is in the price list; labour is billed separately, according to the job established on site.