In progress
In progressThe room before tiling.
In progressThe first tiles on the wall.
In progressA niche formed in the wall.
In progress
In progress
In progressThe frame of the suspended ceiling.
FinishedA suspended ceiling with built-in lighting.
Finished
Finished
FinishedThe water heater and the connections on the finished wall.
FinishedA concealed mixer.
Finished
Finished
FinishedA linear drain in the shower floor.
There are more photos from this job; 15 of 42 are shown here.
Other galleries
Before and afterBefore and after
The same space before the intervention and after it.
15 photos
Rough plumbing works
Various positions: rough-in, pipe runs, chases and preparation for the covering.
13 photos
Finished jobRenovation, rough works and installation
From demolition and rough-in to installing the sanitary ware.
10 photosA fault that cannot wait for morning
A burst pipe, sewage backing up, water that cannot be shut off, a dangerous electrical fault, water reaching the electrical installation, a faulty lock or door. Everything carrying a risk of flood, fire or major damage. We come out at night, on Sundays and on holidays too.
The emergency call-out price is in the price list; labour is billed separately, according to the job established on site.