Municipality Stari Grad
Locksmith in Stari Grad
Locksmith for Stari Grad, for heavy building entrance doors and locks fitted several decades ago.
Many buildings in the old core are protected, so the entrance door is not replaced freely; what is there is repaired instead. The entrances often also have a gate to the courtyard, with its own lock used by several tenants.
What most often goes wrong in Stari Grad
- A jammed lock on a heavy wooden building entrance door.
- The cylinder on a flat, when the key is lost or left in the lock from the inside.
- The lock on a courtyard gate used by several tenants.
- Coming out when the door shuts with the key inside the flat.
Neighbourhoods and parts of the municipality
We cover the whole of Stari Grad: Dorcol, Skadarlija, Kosancicev venac, the area around Kalemegdan, Obilicev venac and Bulevar despota Stefana.
Most entrances in the old core cannot be reached by car, so the tools and material are carried from the nearest place where the van could stop, and the arrival is agreed by phone.
Prices for this trade
Prices from the current price list, the same one on the price list page and in the PDF. Labour, materials and parts are billed separately from the call out.
| Item | Price, RSD |
|---|---|
| The call-out | 2.500 |
| Emergency call-out | 12.000 |
| Call-out to prepare a quote | Not charged |
The whole trade in one place
The full list of jobs in this trade, photographs of work actually done and the way the price is worked out are on the service page.
Questions and answers
Do you come to Stari Grad?
Locksmith in Stari Grad: what is done most often?
How much does a call out to Stari Grad cost?
Do you come out in an emergency to Stari Grad?
A fault that cannot wait for morning
A burst pipe, sewage backing up, water that cannot be shut off, a dangerous electrical fault, water reaching the electrical installation, a faulty lock or door. Everything carrying a risk of flood, fire or major damage. We come out at night, on Sundays and on holidays too.
The emergency call-out price is in the price list; labour is billed separately, according to the job established on site.